The development consists both of buildings and runway infrastructure. The Runway is 3.5m by 45m with 2 shoulders of 15m, a run way strip width of 300m, a taxiway of 190m length with width of 26m and 60m including shoulders for code F compliance. The buildings include the Cargo terminal which is 3240sqm, Employee housing, an Electrical main substation and a Fuel farm. The design included the landslide road system to protect the infrastructure from soil covers.